化德县汇德风力发电有限责任公司

  

化德县汇德风力发电有限责任公司(’汇德风电’)是由湘投国际和湖南湘投地方电力资产经营有限责任公司(‘湖南地电’) 共同投资组建的一家中外合资企业,其中湘投国际占股98%,湖南地电占股2%。公司主要从事风力发电的生产经营、风力发电工程技术咨询、风力发电设备的销售及代理。

 

Huade County Huide Wind Power Co., Ltd (‘HD Wind Power’) is a Sino-foreign company established by XTI and Hunan Xiangtou Local Power Assets Management Co., Ltd.(‘Local Power’). XTI owns 98% shares while Local Power owns 2% shares. The main businesses of HD Wind Power are production and operation of wind power, technical consultation of wind power engineering, sales of and agent for wind power generation equipment.

根据乌兰察布市“十一五”风电发展规划,化德县德包图风电场总面积为432平方公里,规划总装机容量为50万千瓦。汇德风电投资建设的德包图一期49.5MW风电项目,已于2009年3月1日完成所有并网手续,开始商业运行,该项目成为化德县第一个风电建设项目。为了更好地利用该地区得天独厚的风能资源,促进风力发电的规模化发展,在乌兰察布市风电发展的总体规划之下,2009年汇德风电二期建设全面启动,同年汇德风电二期33台风机全部并网发电,2010年1月1日宣布商业运转。汇德风电还计划近年内继续完成德包图风电场三、四、五、六期共298MW风电的开发建设。

 

According to the 11th 5-year plan of wind power development of Wu Lan Cha Bu City, the total area of Huade County, De Bao Tu Wind Farm is 432 square km., the planned total installed capacity is 500 MW. De Bao Tu Phase I (49.5 MW) invested by HD Wind Power has completed all the grid-connection procedures and was commercial operation on March 1st, 2009, the project is the first wind power project in Huade County. In order to use the rich wind energy resources and facilitate the scale of economy development of Wind Power Generation, the HD Wind Power has initialized the Phase II on 2009 under the general planning for the wind power of Wu Lan Cha Bu City, and the commissioning of 33 wind turbines of Phase II has been completed on the same year and been put into operation on Jan. 1st 2010. HD Wind Power also plans to complete the development of the subsequent phase III, IV, V, VI of De Bao Tu Wind Farm, with a total installed capacity of 298 MW.

 

随着汇德风电的逐步建成,不仅能加快化德县各个风电项目建设的步伐,有效地开发当地风能资源,而且对于拉动当地经济将起到积极的推动作用。风能资源的利用将为化德县带来可观的税收收入,并成为化德县“十一五”期间重点支柱产业。

 

The operation of HD Wind Power does not only facilitate the construction of wind power projects in Huade County and develop the local wind power resource, it also contributes to the development of local economy. The utilization of wind energy has contributed tax revenue for Huade County which has become the key industry of Huade County in the 11th 5-year plan period.